Skip to main content
AESCON
Factory structural model on construction drawings

Engineering Design

Structures planned around use and construction

Discuss Your Design

AESCON provides structural engineering design for factories, warehouses and business buildings. We review the intended use, site information and project constraints, and coordinate architectural and building-services drawings to develop clear information for construction planning.

Engineering Design Scope

Agree the scope at the outset so that each part of the design fits together and supports the information your project needs.

Structural Analysis and Design

We consider the building layout, intended use, loads and site information when developing the structural system and project details. Design proceeds on the basis of information reviewed and agreed with the project team.

  • Foundation plans and floor framing layouts
  • Column, beam, slab and roof-structure details
  • Calculations and specifications within the agreed scope

Drawings and Deliverables

Deliverables depend on the building type and contract scope. Agree file formats, the level of detail, revision rounds and drawing approval responsibilities before work starts.

DocumentWhat to Define in the Scope
Structural drawing setPlans, positions, dimensions and component details required for construction
Details and calculationsCalculation scope, assumptions, material specifications and supporting details
Coordination filesFile formats, revisions, responsible parties and BIM model handover, where included

Define separately whether cost estimates and BOQ, permit applications and construction supervision are included in the appointment.

Information to Prepare

Start with the information available so that the team can assess the scope and identify any further surveys needed before proposing a design approach.

Building Type and Use

Business activity, floor area, number of storeys, machinery positions and storage areas.

Site and Existing Buildings

Project location, site dimensions, existing drawings, survey information and any available soil investigation reports.

Drawings and Constraints

Architectural drawings, building-services requirements, access and site constraints.

Budget and Programme

Initial budget, required drawing dates, construction programme and plans for future expansion.

Engineering Design Questions

Can we discuss a project without architectural drawings?

Yes. Start with the proposed building type, area and intended use. The team can assess missing information and the sequence of work before confirming the structural design scope.

Are BOQ and permit applications included?

This depends on the appointment. Define drawings, calculations, cost estimation and permit work separately, including responsibility for the documents in each area.

How are design fees and timescales assessed?

They depend on building type and size, structural complexity, available information, the level of detail and coordination or revision rounds. Project information is reviewed before a fee and delivery programme are proposed.

What if the intended use changes during design?

Share the changes, such as machinery loads, storage areas or the building layout. The team can review their effect on the structure, drawings, budget and programme before agreeing revisions.

Tell Us About Your Project

Share the building type, location, floor area and required programme, together with available drawings or surveys, so that AESCON can assess the engineering design scope with you.