Sustainability in Construction

AESCON aims to use materials efficiently, protect workers and reduce the impact of construction on neighbouring communities.

Explore the Four Areas

Planning for Sustainable Construction

A pencil pointing to a site plan beside a ruler and a sample of box-section steel
Plan cuts before ordering steel
Check the drawings for the length and quantity of each piece of box-section steel. Group pieces with the same cross-section and plan the cuts before placing the order. This helps avoid surplus stock and offcuts that are too short to reuse.
Separate walkways from delivery routes
Keep pedestrian routes separate from delivery vehicles and minimise crossing points. Schedule deliveries outside the times when nearby residents rely most heavily on the access road.

Four Areas of Construction Sustainability

Project decisions affect the cost of running a building, the people who work on and around the site, and the waste it produces. Keeping a record of who approved each decision makes those choices easier to review.

AreaWhat to considerOn-site example
Economic Consider construction costs alongside the cost of maintaining the building over its service life. When several materials meet the specification, compare purchase price, service life and maintenance costs before choosing one.
Governance Define who can approve changes, treat suppliers fairly and keep a record of decisions. For a change in scope, record the work added or removed, the reason, the price adjustment and the name of the person who approved it.
Social Protect workers’ safety, respect their rights and listen to concerns from neighbouring communities. Before noisy work begins, tell neighbours the dates and working hours and give them a way to reach the site contact.
Environmental Use materials efficiently, reduce waste and limit the effects of construction on the surrounding area. Set aside sound formwork for reuse and separate scrap steel from general waste for recycling.
Interior of an industrial building with steel roof trusses, a concrete floor and an open doorway

Before Building Handover

The owner and facilities team should walk the site with the contractor. Check installed items against the as-built drawings, check installed materials against the materials list in the handover documents and record outstanding work before the building opens.

  • Materials and maintenance

    Check the tile references and paint colour codes for each area against the materials list in the handover documents. Keep these details with the care instructions and warranty terms so the facilities team can match finishes when making local repairs.

  • Drawings and defects

    Check that as-built drawings show the actual valve locations and pipe routes, especially where installations changed. Photograph each defect, record its location and agree who will fix it, by when and when it will be inspected again.

  • Spares and site clearance

    Record the type, quantity, storage location and recipient of maintenance spares. Separate reusable materials from waste for removal, then check storage areas, walkways and entrances before opening the building.

Building water meter showing a cumulative reading of 001263 cubic metres

Weekly Water Use

Read the same water meter at the same time on the same day each week. Subtract the previous reading from the latest one to find how many cubic metres passed through that meter during the week.

Compare weeks with similar activity

Note the days the building was open, total operating hours and activities that used extra water, such as washing a warehouse floor. Compare weeks with similar hours and activities.

Investigate higher readings

If activity is similar but water use rises, check for dripping taps and tanks that keep filling after they are full. If the meter advances when no water should be in use, ask the maintenance team to investigate. Check the next reading after repairs.

Calculate water use from meter readings

Enter two cumulative readings from the same meter in cubic metres. In this example, the reading rose from 1,248 to 1,263 over seven days.

Water used15 m³

Construction Sustainability Questions

What should we compare besides the price of two suitable materials?

First check that both materials meet the drawings and suit the location. Then compare installation, maintenance and replacement costs over the period you expect to use the building. For a warehouse walkway, consider whether a damaged section can be replaced on its own and how long the walkway would need to close.

How can we verify that leftover materials were actually reused?

Record where the materials will be used, how much was used and how much came back. If 20 boxes of tiles remain, three are issued for a walkway repair and one is returned, the repair record should show two boxes used. A stock count should find 18 boxes.

What if a delivery vehicle blocks access for neighbours?

Tell the site coordinator where and when the obstruction occurred so they can direct the driver to a safe waiting area and reopen the access. Review the waiting area or delivery time with the haulier, tell affected neighbours what will change and check the same spot during the next delivery.

How do we calculate weekly water use if the meter was replaced?

Record the old meter at the start of the week and before removal. Record the new meter at installation and at the end of the week. Use the calculator for each meter separately, then add the results. A rise from 1,248 to 1,258 on the old meter is 10 m³. A rise from 2 to 7 on the new one adds 5 m³, giving 15 m³ for the week.

Discuss Your Project With AESCON

Tell us the building type, location and total floor area across all storeys, and what you want the project to achieve. For example, you may want to reduce steel offcuts during construction or track water use once the building opens. Include any budget or scheduling constraints in the project details.