Steel frame for an extension beside an existing factory building

Factory Renovation

AESCON renovates and extends factories, from layout planning through construction. We can rework your existing production floor or add space for a new line.

Discuss Your Project

Reconfigure or Extend?

Look at how people, materials and finished goods move through the building. A change to the layout may free up the space you need before you commit to an extension.

Machinery and workbenches beside a marked aisle on a factory floor

Rework the Layout

If materials double back or stored goods block workstations, consider moving machines and staging areas closer to the next production step. Keep delivery routes and maintenance access clear.

Extend the Building

If a revised layout still leaves too little room for a new line or more stock, identify the extra floor area you need, where it will connect and which areas must stay in use during construction.

Global House Projects

These construction projects in Thailand and Cambodia show how AESCON planned around local site constraints and coordinated deliveries with local teams.

Global House Phuket building and surrounding grounds

Global House Phuket

AESCON planned the work around site constraints and environmental requirements, taking the surrounding community into account.

View Phuket Project
Front entrance to Global House Battambang

Global House Battambang

AESCON worked with local teams to move construction materials across the border and coordinate deliveries under Thai and Cambodian requirements.

View Battambang Project

Planning a Factory Extension

Define the space, scope and handover requirements before requesting a quotation.

Choose a planning topic

Would a Mezzanine Fit?

Prepare a floor plan and expected loads so an engineer can assess the existing structure and foundations.

Headroom and access
Measure to the lowest beam or pipe. Mark forklift routes and the proposed stair position on the plan.
Loads and locations
Record how much stock each area will hold and its weight. For machinery, include the weight and installation location.
Mezzanine Guide (Thai)

What Does the Price Cover?

Give each contractor the same drawings and schedule of work so you can compare prices and identify costs to allow for separately.

What the price includes
List demolition, waste removal and connections to the existing building. Identify who will supply each material.
Payment milestones
Agree what must be complete before payment, who will inspect it and which drawings or test results they need.
Contract Guide (Thai)

Who Signs Off at Handover?

When comparing EPC and turnkey proposals, check who is responsible for each task and how the owner will decide whether the work is ready to accept.

Design and procurement
Identify who designs, buys and installs each item, and what the factory owner must approve before work starts.
Acceptance criteria
Agree which systems will be tested, who will witness the tests and which as-built drawings or manuals are due before use.
EPC and Turnkey Guide (Thai)

Factory Renovation FAQs

Can production continue during construction?

In some cases, the construction area can be separated from production and delivery routes. The production team and contractor should first identify work that affects shared power, water or other services. If a shutdown is needed, agree a time and notify the teams affected before work starts.

What if the original building drawings are incomplete?

Gather the drawings, photographs and alteration records you have. Mark areas that have changed or have no records. Engineers can compare them with site conditions and identify what needs surveying before deciding how the extension will connect.

What should we record before demolition?

The owner and contractor should take wide shots and close-ups of existing cracks, leaks and equipment near the work. Date each photograph, mark its location on a plan and keep a shared copy to compare with conditions after construction.

How are unexpected costs agreed after demolition?

Ask the contractor to photograph the issue and check whether the remedy falls within the existing scope. If the scope changes, document the work, the price adjustment and the effect on handover. Obtain written approval under the contract before starting the changed work.

What should we check before reopening each area?

Walk each area with the production team and contractor. Review system test results, access routes and barriers to ongoing work. Record which areas can reopen, which must stay closed, who will resolve outstanding items and when they will be checked again.

Discuss Your Renovation Project